Join the community - networking, discussion and more. Open to all.
More informationCould you write an interesting article for the RQA community?
More information6th September 2023
PIC/S
Entry into force of revised GMP Annex 1
The revised Annex 1 on “sterile manufacturing of the PIC/S GMP Guide entered into force on 25 August 2023 and has been published on https://picscheme.org/en/publications. It entered into operation the same day as the revised Annex 1 of the EU GMP Guide, which is identical with PIC/S Annex 1 (with some minor differences). The revised Annex 1 is now applicable with the exception of paragraph 8.123. This paragraph has a later date of entry into force, which is on 25 August 2024. For the background to the revision of Annex 1, see https://picscheme.org/en/news?dateselect=2022
The revised Annex 1 is an integral part of the PIC/S GMP Guide (PE 009-17), which has also been revised. The GMP Guide has 4 parts: Introduction, Part I, Part II, and Annexes. Annex 1 can be found under ‘PIC/S GMP Guide (PE 009-17) Annexes’.